Creative Electrical Contractors, Inc., is proud of their great partnership with Hampden Sydney College. HSC was formally organized in 1775 and it is the tenth oldest institution of higher education in the United States.  Over the last 17 years we have had the honor of completing numerous jobs directly for the college just under 2 million.  Several of the jobs are listed under the Job Portfolio section individually and in this section we have listed several of the other projects we have completed at Hampden Sydney College over the years.

2016: Morton Hall-Replace & Install 170 fluorescent light fixtures with Cree LED lighting fixtures.  Library-Crosswalk Lighting– Furnish and install 4 bollard light fixtures at the crosswalk between Gilmer and the library. Kirby Field House – Furnish and Install 24 Natatorium LED light fixtures in the Kirby Pool area and 80 fixtures in the basketball area.

2015: Gilmer Hall– (Ground Floor Hallway Lighting)- Furnish all labor and material for replacing twenty-six 2×2 florescent light with new light fixtures. Johns Auditorium (Boiler Install) –Furnish all labor and material for supplying power and connections for two new boilers. Library Parking LotRetrofit two existing parking lot poles to accept 2 owner furnished light fixtures. Install pole bases and circuitry to install 2 new owner furnished parking lot poles and lights.  Provide all necessary circuitry to connect the new lights. Install pole base and circuitry to add an owner furnished sidewalk light fixture

2014: Book StoreFurnish all labor and material for installing 10 pieces of track lighting within the bookstore.   Gammon Gym-Furnish all labor and material for installing one site pole along the sidewalk. Bathroom Renovations-Bathroom Renovations- Furnish all labor and material for electrically renovating seven bathrooms. Kirby House Locker Room– Furnish all labor and material for the electrical portion of the new locker room addition. Presidents House Generator– Furnish all material and labor for a complete electrical installation to furnish and install a Propane Fired Generator. Whitehouse Parking Lot-Furnish all labor and material for installing seven new site poles with LED heads and relocate one existing site pole at the above location.

2013: North Dining Hall- Furnish all materials and labor for a complete electrical installation for the North Dining Hall modifications. Morton Hall– Furnish all labor and material for installing one additional Sun Valley site pole at the sidewalk cross section between Settle Dining Hall and Cushing.  Y – Dorm– Furnish all labor and material for installing one additional Sun Valley site pole along the sidewalk of Y-Dorm and Cushing maintenance road.    

2012: Gilmer HallFurnish all labor and material for removing the air cooled generator from the Brinkley House and re-installing it at Gilmer Hall. Graham Hall -Furnish all materials and labor for a complete electrical installation of the Graham Hall HVAC renovations. Kirby Field House – Furnish all material and labor for installing conduit and wire for six basketball goal winches with key switches. Manor Golf Course– Furnish all materials and labor to install housing Site Light. Rope Road Lighting Upgrades – Furnish all material and labor for a complete electrical installation to install select site lighting in various locations on the campus. Including: Morton Hall, Bagby Hall, Reid House, SAE House. Tiger Inn– Furnish all materials and labor for a complete electrical installation for the Lighting Modifications at Tiger Inn.

2011:Lesley House– Furnish all material and labor for a complete electrical installation to upgrade the electrical system at the Lesley House. Moore House– Furnish all material and labor for a complete electrical renovation of the Moore House. Venable Hall– Furnish all material and labor for a complete electrical renovation of the Venable Hall Bathrooms. Wilson Center– Furnish all material and labor for a complete electrical installation for the Addition at Wilson Center.  CEC also completed the parking lot lighting for the Wilson Center.

2010: Dining Hall– Install a new 600 amp disconnect with the proper fuses for the operation of the chiller. 

2009: Atkinson HallFurnish all material and labor for a complete electrical installation for connecting the three lighting and receptacle panels to a generator. HSC Fire Department- Furnish all material and labor for a complete electrical installation for making connections to an owner supplied generator. Connected all bay doors and bay lights, office lights and devices. Gilmer- Furnish all material and labor for a complete electrical installation for a new 1600 amp outdoor switch gear (120/208 volt) to serve the new chiller. Kirby Field House-Furnish all material and labor for a complete electrical installation for installing new recess lighting in the men’s locker room and recess 2×2 fixtures in the toilet and shower areas.

2008: Via Sacra-Installed conduit and wire to feed the new lighting.  While we trenched most of it, some directional boring was also needed.  The lighting consisted of 9 new poles and 2 lights on the existing columns at the Presidents House.  Gilmer Hall Elevator-Furnish all material and labor for a complete electrical installation for installing a 125 amp shunt trip breaker on the elevator controller, as well as install a GFI receptacle in the elevator room and one GFI receptacle in the elevator pit.

2007: Settle Dining HallInstalled a new Transfer Switch and reworked all the conductors on the service side to upgrade the existing 600 amp service to a 1,000 amp service. 

2006: Dining Hall- Furnish and Install all material and labor for a complete electrical installation. Winston Hall- Installed 3 sets of 3-way switching, (6) 20 amp outlets and (2) closet fixtures in the new wall construction.  Re-worked the existing lighting circuits to separate into 3 different switching modes.